Search the Archive:

January 14, 2004

Back to the Table of Contents Page

Back to The Almanac Home Page

Classifieds

Publication Date: Wednesday, January 14, 2004

Woodside High performing arts center Woodside High performing arts center (January 14, 2004)

Caption with Dennis Sudano photo in print edition: Stage left: At the site of the new performing arts center at Woodside High School, the concrete has been poured for the stage, on the left, and the orchestra pit. The $12 million center, paid for with Measure G bond funds, will seat 500 and include spaces for dressing rooms, rehearsals, instrument storage, a music library, a workshop, a concession stand, a cloak room and a first-aid area.

E-mail a friend a link to this story.

Featured Links


Copyright © 2004 Embarcadero Publishing Company. All rights reserved.
Reproduction or online links to anything other than the home page
without permission is strictly prohibited.