 January 14, 2004Back to the Table of Contents Page
Back to The Almanac Home Page
Classifieds
|
Publication Date: Wednesday, January 14, 2004
Woodside High performing arts center
Woodside High performing arts center
(January 14, 2004) Caption with Dennis Sudano photo in print edition: Stage left: At the site of the new performing arts center at Woodside High School, the concrete has been poured for the stage, on the left, and the orchestra pit. The $12 million center, paid for with Measure G bond funds, will seat 500 and include spaces for dressing rooms, rehearsals, instrument storage, a music library, a workshop, a concession stand, a cloak room and a first-aid area.
E-mail a friend a link to this story. |
|