Caltrain and Atherton can't reach a deal on electrification poles
This is an example of a pole with a cantilevered, horizontal arm spanning two sets of tracks, to support the wires needed for Caltrain electrification. Caltrain says it chose the taller poles to reduce the removal and pruning of trees along the tracks. (Photo courtesy town of Atherton)

© 2018 Almanac Online.
All rights reserved.